Delay to derail $12.8b cost of Metro Tunnel: auditor

The Melbourne Metro Tunnel construction site
Melbourne's Metro Tunnel was originally costed at $10.9b in 2016 but has blown out to $12.8 billion. -AAP Image

Victorian taxpayers will have to fork out more cash to finish Melbourne's long-awaited metro rail tunnel, the state's auditor says.

Hold tight - we’re checking permissions before loading more content